Carlos Alcantara — Van's RV-10
Coeur d'Alene, ID · Last updated Jan 1, 2026 · 366.5 hours logged
Carlos is building a Van's RV-10. Project dates: Nov 1, 2022 – Nov 1, 2028. Substantial progress on the empennage and wings.
Jan 1, 2026 — Wings, fuel tank (Tail feathers / wings)
Completed the upper surface of the wings, the leading edge outboard of the wing, and now building the ER fuel tank.
Mar 28, 2025 — Dimpling (4 hours)
Dimpling all the skins for the wing aft of the main spar top surface. Used a custom dimpling machine for the skins and a pneumatic dimpler for the ribs.
Mar 27, 2025 — Deburring skins (3 hours)
Deburring and chamfering all the holes for the wing skins.
Mar 23, 2025 — Disassemble for top skin (4.5 hours · Wings)
Removed top aft skins from the wings, spar, and ribs ready for deburring. Filed the edges for a better blend where the two top skins overlap.
Mar 22, 2025 — Wings top aft skin (34 hours · Wings)
Fitted ribs aft of the wing, primed all parts, match-drilled the top skin, and machine countersunk holes.
Dec 23, 2024 — Wings main spar prep (28 hours · Wings)
Preparing the main spar for assembling ribs.
May 12, 2023 — Vertical stabilizer (61 hours · Tail feathers)
Built the vertical stabilizer.
Mar 22, 2023 — Elevators (57 hours · Tail feathers)
Built both elevators.
Dec 27, 2022 — Tail cone (128 hours · Tail feathers)
Completed the tail cone.
Dec 22, 2022 — Horizontal stabilizer (47 hours · Tail feathers)
Built the horizontal stabilizer.